Contractor survey / summary of the costs to repair (15 Dec 56) Note the need to make repairs. Contact the factory for several days. (So basically dry For a set period of Pune)
The contractor has / survey summary, repair costs (15 Dec 56) note will need to repair in the factory stopped for several consecutive days (to keep the floor dry for the set of lime)
Contractor/survey summary of expenses on repair and then (Dec. 15 56) Note the need for repairs. During several consecutive days holiday factory (to dry ground in case the stage set of the mortar)