Line development Iwasaki like
CC) DAIPL Kinoshita like
is DAIPL Kawasaki
Thank you for your help
and answers about the contents of the request.
■ how
trial is of material please send directly to processing destination BSL.
(DIT please contact Otte for factory and Chakubi)
, will ship in the DIT than DAIPL for processing parts
costs and processing costs, please issue a prototype request to purchase than DAIPL design (DAIPL: Kinoshita)
this matter, trial support in will do, but you will not be compatible with mass production.
(DAIPL factory can not sell because it does not have a trading function)
■ object diagram number
1p371366-1 A mid-size four T = 1.6 x 836.0 x 1002.0
1P371367-1 A big size eight T = 1.6 x 836.0 x 1316.0
machining tolerance is managed by ± 0.3mm
company name BSL CASTINGS PVT LTD
address PLOT NO.263, SEC-24, FARIDABAD , INDIA
contact number + 91-129-4189800
lead time
sent to DAIPL in material 3 days after obtaining
※ to DAIPL parts on checking, packing shipping day
total number of days 4 days to shipment
BSL → land → DAIPL → land transportation AIR → DIT Tasu
2 days 1 day 1 day to about 6 days
is good if you look material scheduled in two weeks after available.
that's all
การแปล กรุณารอสักครู่..
