What is required to accelerate the Faurecia? Is as follows:1. winning 4 million worth, EOP2. the duration of the operation proposed by the SAIC team 2 months.3.Faurecia is the absolute scale, without the burden and are willing to bear the command to abstain from organic materials and stop the rider leaving the delivery task.4. proposal to the same effect with the SAIC team on both sides. Request to check current and Faurecia, part-stock.
การแปล กรุณารอสักครู่..
