At the time of the noise situation in technology, such as fuse action have been replaced in the field by monitoring pressure after what? Then it's time to see if the measured voltage values in the record?
There are two technical conditions such as fuse operation noise at the time, what was pressed to continue after the replacement and monitoring in the field? So that the record of the voltage values measured over time?
when the fuse action and situation on the technology, the pressure, the more want to monitor. then, a voltage value according to the measuring time of the record.