3.1 planning process (Process Planning).Process planning is the process and order in production.). A good process is a process that the shortest time which means in production until the finished product be minimal.3.2 planning machine (Machine Planning).In the production process to the main machine is the primary need machinery use benefit maximum. According to the theory about the machine to work 24 hours every day, or has stopped working, but in working in real time the loss of machinery have things. Such as stop to adjust the target, stop to repair, stop, because there is no work enter, stop to ตรวจสอบชิ้นงาน, etc..3.3 planned labor (Man Planning).Planning labor is similar Planning machine is to make the working process continuously to most however, don"t forget the labour law at the time at work. Stay clear. Therefore planned labor is more difficult than ตัว. planning machine3.4 collection planning (Store Planning).Planning the store. Mean planned to control material inventory at a reasonable level, which means that there is enough ต่อการใช้งาน and not too high under the target levels.? This collection includes planning Planning storage products during the production, products, instant, goods package.
การแปล กรุณารอสักครู่..
