Can we please check why it’s over shipment.
We cannot be like found an over shipment and then CN and wait for next shipment.
That is an to do action understand but what is a preventive action?
If we plan 9.821 cbm (SSL) + 15.445 cbm (Bangplee) = 25.266 why do we still have short ship.
What is the reality of 20 ft’ container we can load now? Do we plan correctly? Or is data in JDE correct?
This item is the most Important in this container, also it’ strepsil which required temperature control? Why do we decide to leave this one?
Regards,